The order of assembly for the 1v1 field is as follows:
1️⃣ Roll out the three mats on the ground next to each other so that they all run parallel to each other. Use tape to seal the gaps between them.
Assemble Field Perimeter (Instructions)
Place and Secure Bunkers (Instructions)
PVC & Netting (Instructions)